Document Number Title Revision Publish Date Reviewed Date
IN-02-36 Incomplete or Inaccurate Information Provided to the Licensee And/or NRC by Any Contractor or Subcontractor Employee -- 12/27/2002 --
IN-02-35 Changes To 10 CFR Parts 71 AND 72 Quality Assurance Programs -- 12/20/2002 --
IN-02-34 Failure of Safety-Related Circuit Breaker External Auxiliary Switches at Columbia Generating Station -- 11/25/2002 --
IN-02-33 Notification of Permanent Injunction Against Neutron Products Incorporated of Dickerson, Maryland -- 11/22/2002 --
IN-02-32 Electromigration on Semiconductor Integrated Circuits -- 10/31/2002 --
IN-02-31 Potentially Defective UF6 Cylinder Valves (1-inch) S1 03/24/2003 --
-- 10/31/2002 --
IN-02-30 Control and Surveillance of Portable Gauges During Field Operations -- 10/30/2002 --
IN-02-29 Recent Design Problems in Safety Functions of Pneumatic Systems ERRATA 11/06/2002 --
-- 10/15/2002 --
IN-02-28 Appointment of Radiation Safety Officers and Authorized Users Under 10 CFR Part 35 -- 09/27/2002 --
IN-02-27 Recent Fires at Commercial Nuclear Power Plants in the United States -- 09/20/2002 --
IN-02-26 Failure of Steam Dryer Cover Plate After a Recent Power Uprate S2 01/09/2004 --
S1 07/21/2003 --
-- 09/11/2002 --
IN-02-25 Challenges to Licensees Ability to Provide Prompt Public Notification and Information During an Emergency Preparedness Event -- 08/26/2002 --
IN-02-24 Potential Problems with Heat Collectors on Fire Protection Sprinklers -- 07/19/2002 --
IN-02-23 Unauthorized Administration of Byproduct Material for Medical Use S1 03/21/2006 --
-- 07/16/2002 --
IN-02-22 Degraded Bearing Surfaces in GM/EMD Emergency Diesel Generators -- 06/28/2002 --
IN-02-21 Axial Outside-Diameter Cracking Affecting Thermally Treated Alloy 600 Steam Generator Tubing S1 04/01/2003 --
-- 06/25/2002 --
IN-02-20 Microwave Perimeter Intrusion Detection System Installation -- 06/20/2002 --
IN-02-19 Medical Misadministrations Caused by Failure to Properly Perform Tests on Dose Calibrators for Beta-and-Low Energy Photon-Emitting Radionuclides -- 06/14/2002 --
IN-02-18 Effect of Adding Gas Into Water Storage Tanks on the Net Positive Suction Head for Pumps -- 06/06/2002 --
IN-02-17 Medical use of Strontium-90 Eye Applicators: New Requirements for Calibration and Decay Correction -- 05/30/2002 --
IN-02-16 Intravascular Brachytherapy Misadministrations -- 05/01/2002 --
IN-02-15 Hydrogen Combustion Events in Foreign BWR Piping S1 05/06/2003 --
-- 04/12/2002 --
IN-02-14 Ensuring a Capability to Evacuate Individuals, Including Members of the Public, from the Owner-Controlled Area -- 04/08/2002 --
IN-02-13 Possible Indicators of Ongoing Reactor Pressure Vessel Head Degradation -- 04/04/2002 --
IN-02-12 Submerged Safety-Related Electrical Cables -- 04/21/2002 --
IN-02-11 Recent Experience with Degradation of Reactor Pressure Vessel Head -- 03/12/2002 --
IN-02-10 Nonconservative Water Level Setpoints on Steam Generators S1 06/28/2002 --
-- 03/07/2002 --
IN-02-09 Potential for top Nozzle Separation and Dropping of a Certain Type of Westinghouse Fuel Assembly -- 02/13/2002 --
IN-02-08 Pump Shaft Damage Due to Excessive Hardness of Shaft Sleeve -- 01/30/2002 --
IN-02-07 Use Of Sodium Hypochlorite for Cleaning Diesel Fuel Oil Supply Tanks -- 01/28/2002 --
IN-02-06 Design Vulnerability in BWR Reactor Vessel Level Instrumentation Backfill Modification -- 01/18/2002 --
IN-02-05 Foreign Material in Standby Liquid Control Storage Tanks -- 01/17/2002 --
IN-02-04 Wire Degradation at Breaker Cubicle Door Hinges -- 01/10/2002 --
IN-02-03 Highly Radioactive Particle Control Problems During Spent Fuel Pool Cleanout -- 01/10/2002 --
IN-02-02 Recent Experience with Plugged Steam Generator Tubes S1 07/17/2002 --
-- 01/08/2002 --
IN-02-01 Metalclad Switchgear Failures and Consequent Losses of Offsite Power -- 01/08/2002 --

To top of page