The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Information Notices – 2018

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Document Number Title Revision Publish Date Reviewed Date
IN-18-11 Kobe Steel Quality Assurance Record Falsification S1 12/01/2020 --
-- 09/24/2018 --
IN-18-10 Thermal Sleeve Flange Wear Leads to Stuck Control Rod at Foreign Nuclear Plant -- 08/29/2018 --
IN-18-09 Electrical Arc Flash Caused by Foreign Material Damages Fire Door -- 08/10/2018 --
IN-18-08 Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box -- 06/13/2018 --
IN-18-07 Pump/Turbine Bearing Oil Sight Glass Problems -- 06/13/2018 --
IN-18-06 Determination of Management Measures for Process Isolation Controls Designated as Items Relied on for Safety and Implementation of Adequate Quality Assurance Measures for Plant Features and Procedures -- 04/10/2018 --
IN-18-05 Long-Term Fissile Material Accumulation Due to Unanalyzed or Improperly Analyzed Conditions at Fuel Cycle Facilities -- 03/26/2018 --
IN-18-04 Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions -- 02/26/2018 --
IN-18-03 Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions -- 02/26/2018 --
IN-18-02 Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves -- 02/26/2018 --
IN-18-01 Noble Fission Gas Releases During Spent Fuel Cask Loading Operations -- 02/21/2018 --

Page Last Reviewed/Updated Wednesday, March 10, 2021